KiTraffic Digital WIM system has been awarded the OIML certificate by the Swiss METAS institute for metrology, confirming it as the most accurate weigh-in-motion solution.
Asphalt pavers from Volvo CE have played an important role in the renovation of an airport runway at the Wunstorf air base in Germany. The contractor Strabag faced the challenge of placing new asphalt on the runway in the shortest possible time.
Gardner Asphalt says that its NTQS1 Trackless Tack is the most innovative non-ionic chemical asphalt emulsion for application where a tenacious tack coat is required.
Simex has designed its new VS 1500 screening bucket for separating materials of different sizes directly onsite and suits applications in demolition works.
The project of a double-track 8 km long extension of the railroad line between Varberg and Hamra includes a new 3.1 km long tunnel. This new double track on the West Coast Railway is scheduled to be opened to traffic in 2024. Leading Swiss construction and infrastructure specialist Implenia is using state-of-the-art technology and data acquisition solutions on a fleet of Dynapac CA5000D Seismic rollers for the work under the town of Varberg. The focus is on efficiency, environmental improvement and road safety.