The operation is now using one of the EC220DL excavator models, which has helped boost productivity by some 30%. In addition, the machine is said to be delivering savings in running costs at the Alam Jaya volcanic rock quarry, through reducing fuel consumption by two litres/hour.
The site is located close to West Java’s capital city, Bandung, at the foot of the volcano, Tangkuban Perahu. The city is home to 2.5 million people and sits at 768m above sea level, while it benefits from one of Indonesia’s coo