JPE AGGREGATES is buying a new CDE construction and demolition waste recycling plant as the solution to its waste recovery operations at Elford Quarry, County Staffordshire, England. The new plant includes an M2500 E3 mobile washing plant; AggMax 150R attrition system; AquaCycle A400 thickener and a VSI crusher. The M2500 E3 system includes feeding, screening, sand washing and stockpiling on a single chassis while the AggMax 150R system incorporates a RotoMax logwasher, which is a twin shaft system, 8m long
The new plant includes an M2500 E3 mobile washing plant; AggMax 150R attrition system; AquaCycle A400 thickener and a VSI crusher.
The M2500 E3 system includes feeding, screening, sand washing and stockpiling on a single chassis while the AggMax 150R system incorporates a RotoMax logwasher, which is a twin shaft system, 8m long and dressed with 132 paddles constructed to ensure maximum attrition of the material being processed.