Work is underway on the second phase of a new highway in China. The route connects Xihua and Zhoukou with Zhengzhou Airport. The new highway is due for completion in 2017 and will be 45km long, with a maximum speed limit of 120km/h. The six lane highway is costing US$805 million to construct.
Work is underway on the second phase of a new highway in China. The route connects Xihua and Zhoukou with Zhengzhou Airport. The new highway is due for completion in 2017 and will be 45km long, with a maximum speed limit of 120km/h. The six lane highway is costing US$805 million to construct.