Putzmeister’s new self-propelled pump can be quicker than a truck mount
Putzmeister’s new self-propelled pump can be quicker than a truck mount
Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
April 19, 2012
Read time: 1 min
Small and self contained, the new BSC 1409D is faster to set up than a truck-mounted pump.
1259 Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar.
Powered by a 6-cylinder 201 Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves. %$Linker: 2External<?xml version="1.0" encoding="utf-16"?><dictionary />000oLinkExternal<span style="line-height: 115%; font-size: 12pt">www.putzmeister.de</span>Putzmeister websitefalsehttp://www.putzmeister.de/falsefalse%>%$Linker: 2Internal<?xml version="1.0" encoding="utf-16"?><dictionary />248240oLinkInternal<span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span>Videofalse/event-news/intermat-2012/video/truefalse%>
Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
The BSC 1409 D from Putzmeister is a self-propelled concrete pump designed specifically for concreting drilled piles on unfinished surfaces. In contrast to using truck-mounted concrete pumps for concreting drilled piles, it does not need supports to be set up each time it changes location. Compared to concreting with a delivery pipe, placement speed with the tracked concrete pump is now said to be considerably higher.