Marini’s new eTOWER 2500 asphalt plant on show at bauma 2013 is capable of producing 200tonnes/hour of asphalt. Details of the full Fayat-owned Marini brand range will also be available at the world’s biggest construction equipment show in the Fayat Group’s ‘Asphalt Pavilion’. The Pavilion, which will include touchscreen and videowall presentations, will include a special focus on Marini mobile and warm mix asphalt lines.
January 6, 2017
Read time: 1 min
273 Marini’s new eTOWER 2500 asphalt plant on show at 688 Bauma 2013 is capable of producing 200tonnes/hour of asphalt. Details of the full Fayat-owned Marini brand range will also be available at the world’s biggest construction equipment show in the 2779 Fayat Group’s ‘Asphalt Pavilion’. The Pavilion, which will include touchscreen and videowall presentations, will include a special focus on Marini mobile and warm mix asphalt lines.
Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup
The Fayat Group intends to buy a number of assets from CMI Terex from its road building operations. The purchase agreement covers acquisition of certain product lines in North America, and the road building operations of Terex in Brazil. This deal will be a significant breakthrough for Fayat’s road machinery subsidiary BOMAG as well as the mixing plant business unit operations Marini Ermont. “The addition of these product lines enhances the position of the Fayat Group as the only full liner in road building